福彩快三首页登录

  • <tr id='nUirrh'><strong id='nUirrh'></strong><small id='nUirrh'></small><button id='nUirrh'></button><li id='nUirrh'><noscript id='nUirrh'><big id='nUirrh'></big><dt id='nUirrh'></dt></noscript></li></tr><ol id='nUirrh'><option id='nUirrh'><table id='nUirrh'><blockquote id='nUirrh'><tbody id='nUirrh'></tbody></blockquote></table></option></ol><u id='nUirrh'></u><kbd id='nUirrh'><kbd id='nUirrh'></kbd></kbd>

    <code id='nUirrh'><strong id='nUirrh'></strong></code>

    <fieldset id='nUirrh'></fieldset>
          <span id='nUirrh'></span>

              <ins id='nUirrh'></ins>
              <acronym id='nUirrh'><em id='nUirrh'></em><td id='nUirrh'><div id='nUirrh'></div></td></acronym><address id='nUirrh'><big id='nUirrh'><big id='nUirrh'></big><legend id='nUirrh'></legend></big></address>

              <i id='nUirrh'><div id='nUirrh'><ins id='nUirrh'></ins></div></i>
              <i id='nUirrh'></i>
            1. <dl id='nUirrh'></dl>
              1. <blockquote id='nUirrh'><q id='nUirrh'><noscript id='nUirrh'></noscript><dt id='nUirrh'></dt></q></blockquote><noframes id='nUirrh'><i id='nUirrh'></i>
                Welcome to visit!
                描述
                86-180-2029-8399
                86-510-8873-9100
                Service Tel
                描述

                What are the acceptance work of duplicate pipeline compensation joints?

                author: time:2021-02-22 classify:Professional knowledge
                All compensation joints are installed and inspected and then pressure tested together with the pipeline. There should be no leakage at welds, flange joints and sealing positions.

                All compensation joints are installed and inspected and then pressure tested together with the pipeline. There should be no leakage at welds, flange joints and sealing positions.

                When the compensation joint leaks in the pressure test, the method of adjusting the gland bolt should be adopted to eliminate the leakage.

                The brackets (guide brackets and fixed brackets) equipped in the construction and installation pipelines should meet the requirements for the use of compensation joints.